Installers setting a white quartz countertop onto kitchen cabinets
INSTALLATION / LYNNWOOD & GREATER SEATTLE

Countertop installation.
The details come home.

A finished surface should feel like it belongs. Our team installs countertops with attention to placement, leveling and the final details, serving Seattle, Lynnwood and the Eastside. We help you know what to expect before installation day.

Rated 5.0 on Google, based on 34 customer reviews.

Top Granite project reference
HOW IT WORKS

A clear plan
for installation day.

From a ready room to the final walkthrough, each step gives you and our team something clear to prepare for.

STEP 01 / 05

Know what is arriving.

Review the material, layout, edge profile, cutouts and installation scope. Our team coordinates the finished pieces and confirms your installation schedule.

Your part

Keep the selected sink, faucet and appliance details consistent with the approved plan.

CLEAR EXPECTATIONS. A BETTER PROJECT.

Know what’s covered.
Plan what comes next.

Countertop leveling is part of installation. Cabinets must already be secured and level; discuss any preparation or support work before the visit.

What’s included

  • Countertop placement and installation to the approved layout.
  • Leveling and alignment of the installed countertop.
  • Agreed seam and finishing work.
  • A final walkthrough and care guidance for your selected surface.

What’s not included

  • Plumbing reconnection: your plumber handles this.
  • Sinks, faucets and appliances: the customer supplies these.
  • Cabinet construction or structural changes are not part of standard countertop installation.
Our team on site: the seam and the seal, done by hand.
INSTALLED BY OUR TEAM

Care at the edge.
Attention at the seam.

Our team carries the approved plan into your home, from the position of each piece to the final walkthrough. We coordinate fabrication with our Mukilteo partner and handle installation with our own team, so you have a clear point of contact.

Our countertop installation comes with a 5-year workmanship warranty. We’ll explain the written coverage and care requirements; manufacturer product warranties are separate.

Compare countertop materials
GOOD QUESTIONS. CLEAR ANSWERS.

Before your
installation project.

A few details now can make the next step easier. Our team can help with questions specific to your space.

Explore the countertop help center
Do you reconnect the sink and faucet?

No. Plumbing reconnection is not included in countertop installation. Arrange your plumber to reconnect the sink and faucet after installation, following the timing our team confirms.

Do I need to buy the sink and faucet?

Yes. The customer supplies the sink, faucet and appliances. Have the items or their approved specifications available when requested so cutouts and installation details match your selections.

What needs to be ready before installation?

Cabinets need to be secured and level, with required preparation completed. Clear the work area and access route, and confirm support requirements and product specifications with our team before the visit.

When can installation be scheduled?

We confirm timing after reviewing material availability, the fabrication plan, and site readiness. Coordinate plumbing and any cabinet preparation with the schedule agreed with our team.

How are payment and warranty terms confirmed?

Your written quote or contract sets out the payment terms and project scope. Top Granite provides a 5-year workmanship warranty, with the applicable coverage explained in your project documents.

WHERE WE WORK

Countertops across greater Seattle
and the Eastside.

Based in Lynnwood, we template, coordinate fabrication and install in these cities. Pick yours for local details, or see the full service area.

GET READY FOR INSTALLATION DAY

Get your project ready for installation.

Share your layout, selected material, and the condition of your cabinets. Our team will help you identify what needs to be ready and plan the installation scope.

02 / I’M EXPLORINGPlan my countertop budget An estimated range with the details you have.Call 206-653-4479 ↗︎
WhatsAppText usCall 206-653-4479

Let’s start with your project.

Only if you already have them: up to 5 files (photos, sketches or PDF), 25 MB each.

By sending this request you agree to be contacted about it. We reply within 24 hours.

Or call 206-653-4479 ↗︎

Hear it from Ricardo.

Watch on YouTube ↗︎